Hardware Installation; First Step: Open A Seal; Second Step: Switch Installation; Desktop Or Shelf Installation - Digisol DG-GS1510PL User Manual

8 port gigabit web managed poe switch with 2 giga sfp ports
Hide thumbs Also See for DG-GS1510PL:
Table of Contents

Advertisement

Hardware installation

This chapter provides unpacking and installation information for the Managed PoE switch.

First step: open a seal

Open the shipping carton and carefully unpack its contents. Please consult the packing list located in the User
Manual to make sure all items are present and undamaged. If any item is missing or damaged, please contact
the local re-seller for replacement.
Switch 1pcs
AC power cord 1pcs
Rubber feet 4pcs
Screws 6pcs
Mounting brackets 2pcs
CD
If any item is found missing or damaged, please contact the local re-seller for replacement.

Second step: switch installation

For safe switch installation and operation, it is recommended that you:
Visually inspect the power cord to see that it is fully secured to the AC power connector.
Make sure that there is proper heat dissipation and adequate ventilation around the switch.
Do not place heavy objects on the switch.

Desktop or Shelf Installation

When installing the switch on a desktop or shelf, the rubber feet included with the device must be attached on
the bottom at each corner of the device's base. Allow enough ventilation space between the device and the
objects around it.
Page 6
DG-GS1510PL User Manual

Advertisement

Table of Contents
loading

Table of Contents