OPERATING AND COMMISSIONING INSTRUCTIONS
I.1.

End of life

In accordance with the partnerships with the compagny ECOLOGIC.
collection, removal and treatment of Waste Electrical and Electronic Equipment.
At the end of the life of this equipment, the user contacts the company ECOLOGIC who will propose a collection solution or a
place of deposit for the product.
Contacts for pick-up requests:
E-mail: operations-pro@ecologic-france.com
Phone: 01 30 57 79 14
Internet: www.e-dechet.com
II. INSTALLATION

II.1. Handling

The units must only be moved in their installation position.
If the device is handled using a fork-lift truck, ensure this supports the load-bearing structure
If the device is moved using a crane, use four cables of identical lengths. These must be at least as long as the greatest distance
between two fastening points.

II.2. Space required

FREETIME
II.2.a.
Generally speaking, it is desirable to provide access space equal to L
MS-CDF-010
®
INDOOR INSTALLATION ONLY
Ind F
Maj. 18/05/2017
® -
FREETIME
HEXAMOTION
High Efficiency Recovery Unit
CALADAIR fulfills the obligations to finance the
Créé par : JC
®
Supply air
Extract air
Validé par : AR
Page 5/57