Ii.2.B. Hexamotion; Ii.3. Installation - Caladair Freetime Series Operating And Commissioning Instructions

High efficiency recovery unit
Table of Contents

Advertisement

OPERATING AND COMMISSIONING INSTRUCTIONS

II.2.b. HEXAMOTION

II.3. Installation

The unit must be laid on a sufficiently rigid and flat surface (use vibration mounts if necessary). For the HVAC connection,
select duct sections based on dimensions of the flexible bands that should be properly stretched. Install the unit such that bad
weather or ambient temperature cannot damage the internal items of the unit during installation as well as when used later
Provide a siphon on each condensate drainage pipe. A siphon can only be used for one drainage system.
Note: the siphon must be connected in accordance with Best Practices in order that the condensates are
removed as efficiently as possible
The height H must be at least equal to the maximum internal negative pressure of the unit (Dp in mm).
Example : Dp = 500 Pa @ 50 mm CE
MS-CDF-010
®
.
H > 50 mm
2H > 100 mm
Ind F
Maj. 18/05/2017
® -
FREETIME
HEXAMOTION
High Efficiency Recovery Unit
Créé par : JC
®
Validé par : AR
Page 6/57

Advertisement

Table of Contents
loading

Table of Contents