Cycle Sequence - Hellenbrand H-125 Series Owner's Manual

Water conditioning system
Hide thumbs Also See for H-125 Series:
Table of Contents

Advertisement

Anytime cycle sequence is modified, softener set-up will revert to
manufacturer setting and must be reprogrammed as desired.
Cycle Sequence instructions allows the operator to set the order of the
cycle. The Softener System Setup allows the operator to set how long
the cycles will last. The operator may choose up to 9 cycles in any order.
END must be used as the last cycle option. The SERVICE cycle should
only be used in brine prefill applications to allow salt to dissolve.
The following is an example of how to set a valve so that when regeneration is initiated, BACKWASH occurs first, REGENERANT
DRAW DN occurs second, RINSE occurs third, and FILL occurs fourth.
STEP 1CS
VALVE TYPE
1.25
STEP 2CS
SET
ALTERNATOR SYSTEM
STEP 3CS
OFF
SET
ALTERNATOR SYSTEM
ALT A
SET
REFRESH RINSE
TYPE
SET
15

CYCLE SEQUENCE

STEP 1CS – Press NEXT and  simultaneously until TYPE appears on screen and release.
Then press NEXT and  simultaneously again for 3 seconds and release. If screen in step 2CS
does not appear in 5 seconds the lock on the valve is activated.
STEP 2CS – Valve Type. Use the  or  to select from 1.0", 1.25", 1.50", 2.0L", 2.0" valve.
H125 is a 1.25" meter. Press NEXT to go to Step 3CS.
STEP 3CS – Use the  or  to select one of the following:
• Twin Alternating System – Select Alt A or Alt B, See instructions in Step 4CS; or
• System Controller Enabled - Allows Demand Recall Programming – See instructions in Step 9CS.
• No Hard Water Bypass During Regeneration – See instructions in Step 6CS.
• Reclaim Enabled - Allows control to operate in Reclamation Mode – See instructions in Step 8CS.
• Separate Source Enabled - Allows control to have a separate water source during the
regeneration cycle. See instructions in Step 7CS.
• OFF; Factory Setting is OFF - Press NEXT to go to Step 10CS.
STEP 4CS –Twin Alternating System – Allows automatic alternation between two
STEP 4CS
units to provide softened water 24 hours a day.
Use  or  buttons to select ALT A or ALT B
Select ALT A for the control valve that has the two-pin connector labeled MAV DRIVE
connected to the alternator valve.
Select ALT B for the control valve that will be connected via three-prong connector
labeled INTERCONNECT. Must use 3-wire interconnect cable. Press NEXT to go to
Step 5CS.
For Alternating System, change programming:
• Set softener, with volume capacity in GALLONS and select
Regeneration Time Option "IMMEDIATE" or "DELAYED" and select DAYS BE-
TWEEN REGEN as desired.
• For complete programming, see Twin Alternating MAV manual.
STEP 5CS – Select Twin Alternating Option.
STEP 5CS
MIN
Use  or  buttons to select
• Standard - Standard Alternating Function
• Refresh Rinse - Alternates every 6am & 6pm and runs programmable number of gal-
lons to service. Press NEXT to set number of gallons.
• Delayed Rinse and Fill- See below
• Factory Setting is Standard Alternating Function
This option delays the last two cycles of regeneration (only "Rinse" and "Fill"). This
feature splits the regeneration into two portions. The first portion of the regeneration
will start immediately and all programmed cycles before the "Rinse" and "Fill" cycles
will be performed. After all programmed cycles before "Rinse" and "Fill" are completed
the control valve will drive to the service position (displaying "Delayed Rinse + Fill
Pending"). When the volume of the on-line unit is depleted to 10% of its programmed
capacity, the control valve will be triggered to finish the second portion of the regenera-
tion and complete the "Rinse" and "Fill" cycles and return to Service and be placed into
Standby mode, and wait to come on-line for service. Press NEXT to go to Step 10CS.
Cycle Options
REGENERANT
BACKWASH
DRAW-DN
RINSE
SOFTENING
FILL
END

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents