Eclipse AH-MA Series Design Manual page 10

Airheat burners

Advertisement

tep 1:
Burner design
0
alculating the maximum input requirements
o calculate the total burner maximum input required, solve:
ax. Input (Btu/hr) = 1.3 x SCF x
aution:
This is an approximation based on the gross heating value of the
fuel. For more accurate heat balance calculations, refer to the
Eclipse ombustion Engineering Guide (EFE-825).
hoosing design heat input at high fire
ee Data heet No. 160 for the following:
1) Use the “Operating Range” chart to determine the maximum and
minimum heat inputs per foot of burner based on the known air
pressure drop.
2) Use the “Flame Length” chart to check flame length versus available
distance downstream of the burner for uniform temperature
distribution.
Determining the length of burner needed
urner length, feet = max. heat input, total burner ( tu/hr)
Note:
Round fractional lengths (in ft.) up to the next half-foot.
alculating minimum input required
inimum Input (Btu/hr) = 1.3 x SCF x
)
i n . Heat Input per foot, Btu/hr/ft = mi n . heat i n put, total burner, Btu/hr.
)
) With the minimum heat input per foot, go to the “Operating
Range” chart in Data Sheet No. 160 and confirm that the burner
can operate at the input for the air pressure drop the burner will
see. If the minimum input required is too low, there are two
options to obtain this operating condition:
a. Use a staged burner control (see burner staging and control
methods in this section).
b. Modulate the air flow to a lower pressure drop, thus lowering
the minimum input capability of the burner.
xample
A make-up air heat burner will be used to heat
60,000 SCFM air from 0°F to 80°F maximum; and, from 75°F to
80°F minimum. Air
P across the burner is designed to be
0.7"w.c. at high fire. The fuel is natural gas.
1 ) Max. Input Required
Btu/hr .
clipse AH-MA Air Heat Burner v2, Design Guide 160, 8/1/05
T (max)
heat input per foot ( tu/hr/ft)
burner l e ngth, feet
Btu/hr = 1.3 X 60,000 X 80 = 6,240,000
(min)
D