Unpacking And Installation; Unpacking; Checking For Damaged/Missing Items; Physical Arrangements - Cannon TE-3000 Instruction & Operation Manual

Thermo electric temperature bath
Table of Contents

Advertisement

CHAPTER
3 3 3 3 3
A. Unpacking
B. Checking for damaged/missing items
Damaged items
C. Physical arrangements
The TE-3000 should be inspected immediately upon arrival. If the
shipping containers have been damaged externally, the shipping company
should be advised of this condition immediately.
The contents should be carefully removed and placed on a stable bench
or table for further inspection. Retain all original shipping materials and
containers which will be needed if the return of the instrument is neces-
sary for warranty repair/replacement.
After all items have been removed from the shipping container and
placed on a bench or table, the items should be compared to the packing
list.
Inspect each component for signs for damage. Report damages to the
shipper and to the CANNON
Retain all packing materials until the instrument is connected and func-
tioning properly. If any component(s) must be returned to
CANNON
Instrument Company, the damaged item(s) should be pack-
®
aged in the original shipping container. Refer to the final chapter of this
manual for instructions on returning defective equipment. Customers
outside the United States should contact the local CANNON
procedures on returning products to CANNON
If an item is missing, please notify CANNON
immediately.
Sections A through C in the previous chapter dealing with item descrip-
tions should be read prior to this section. The final placement for the TE-
3000 should be a level, strong, and stable bench or table surface.
Occasional access to the rear of the unit should be conveniently permit-
ted. The bath requires adequate ventilation for the integral cooling fans so
a space of at least eight inches should be provided between the rear and
both sides of the TE-3000 and any wall or other obstruction. A clearance
CANNON
®
TE-3000 Thermoelectric Constant Temperature Bath
Version 1.1c — May, 2005; CANNON
2139 High Tech Road • State College, PA 16803 • USA
UNPACKING AND
INSTALLATION
Instrument Company immediately.
®
.
®
Instrument Company
®
®
Instrument Company
5
agent for
®

Advertisement

Table of Contents
loading

Table of Contents