Download Print this page

Mitsubishi Electric GT1020 Series Startup Manual page 6

Graphic operation terminal, fx connection
Hide thumbs Also See for GT1020 Series:

Advertisement

To access the OS installation mode of the GT1020/GT1030,
switch the GOT power from OFF to ON, while holding the
bottom right corner of the touch screen (in Horizontal
layout), illustrated to the right.
Confirm Communication
Before downloading project data to the GOT, the Comm. Monitor
function can be used to verify that the GOT is communicating properly with
the PLC. If no error is shown, communication has been set up correctly.
Manual References:
Refer to the following manuals for more detailed explanations. For any
further questions, please contact your local Mitsubishi Product Provider.
GT10 User's Manual (JY997D24701)
GT10 General Description (JY997D22901)
RS-232 / USB Conversion Adapter User's Manual (JY997D23401)
GOT1000 Series Connection Manual 1/3 (SH(NA)-080532ENG)
Note: This document is for reference only. For detailed settings and safety information refer to the respective product manual.
- Sections 3.1.5, 3.1.6, 3.1.7, 3.2.1, 3.2.2
While the "Please install
the OS" screen is displayed, go to the "OS
Install -> GOT" tab in the "Communicate
with GOT" window of GT Designer2 and
select "Standard monitor OS" from the
data selection tree. Use the "Install"
button to initiate the data transfer and
update the firmware. Once the firmware
update has been completed the GOT will
automatically reboot and all features will
be up to date. Note that new project data
will need to be downloaded to the GOT.
6
Power ON

Advertisement

loading

This manual is also suitable for:

Gt1030 seriesGot1000 seriesGt1020Gt1030Gt1020-lbdGt1020-lbdw ... Show all