Installation And Start-Up - Circutor AMk-ITF Instruction Manual

3 phase energy electronic meters
Table of Contents

Advertisement

----- AMk-AM2k -400 V- ELECTRONIC METERS --------
3.- INSTALLATION AND STARTUP
The manual you hold in your hands contains information and warnings that the user
should respect in order to guarantee a proper operation of all the instrument
functions and keep its safety conditions.
The instrument must not be powered and used until its definitive assembly on the
cabinet's door.
Whether the instrument is not used as manufacturer's specifications, the
protection of the instrument can be damaged.
When any protection failure is suspected to exist (for example, it presents external
visible damages), the instrument must be immediately powered off. In this case
contact a qualified service representative.
3.1.- INSTALLATION
Before applying AC power to the, check following points :
(a) Power supply is taken from own phases L2-L3 at 400 V a.c. ± 15 %
M-981 189 --- Page Nº
5

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMk-ITF and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Am2k-itf

Table of Contents