Figure 8 Insulation Sleeve Installation; Figure 9 Expansion Nut Installation; Figure 10 Insulation Sheet Installation - Zte ZXSDR BS8800 C200 Installation Manual

Cdma indoor basestation
Table of Contents

Advertisement

ZXSDR BS8800 C200 Installation Manual
26
Confidential and Proprietary Information of ZTE CORPORATION
ii. Install four insulation sleeves on the installation holes to
make sure the expansion nuts insulated with the ground,
as shown in
F
8 INSULATION SLEEVE INSTALLATION
IGURE
iii. Insert the expansion nuts vertically into the insulation
sleeves, and knock the nuts with a rubber hammer to
make them completely into the ground, as shown in
9.
F
9 EXPANSION NUT INSTALLATION
IGURE
4. Adjust an insulation sheet and align two holes on the insulation
sheet with those on the ground, as shown in
F
10 INSULATION SHEET INSTALLATION
IGURE
Figure
8.