X-axis calibration
1. Remove the connectors to the X-axis, Y-axis, and C-axis motors from the main board. (Refer to page 75)
2. Put the 200μl SP Tips at the W4 at the both sides of the T-rack.
3. Move the X-axis and Y-axis to the position that the piston take out the 200μl SP Tip.
Move the piston to align with the tip.
Move the piston downward to insert the piston into
RBCBioscience
76