2.6 Cabinet Cleaning
WARNING: DO NOT clean with any product containing bleach or ammonia. Rinse
Prior to use, the interior and exterior surfaces of the cabinet should be cleaned thoroughly with warm
water, mild detergent, and a soft cloth. Apply with a dampened cloth and wipe in the direction of the metal
grain. Then allow to air dry with the doors open. Only use a clean soft cloth. See detailed cleaning
instructions in the Preventative Maintenance section below.
2.7 Electrical supply
115 volt self-contained units are provided with a 15 or 20 amp power chord with plug that is shipped
coiled on top of the cabinet. The power cord is equipped with a three prong (grounding) plug which is to
be used in an appropriately rated and dedicated three prong (grounding) receptacle.
*NOTE: have a wall outlet checked by a qualified electrician for polarity and proper grounding
prior to plugging in the power cord.
For units not provided with a power cord, the electrical connection should be made by a qualified
electrician and in accordance with local electrical codes. The electrical requirements are located on the
rating (or data plate) located on the left hand side of the interior of the cabinet. Use of a dedicated circuit
with separate grounding wire is required.

2.8 Controller

The controls are designed for the refrigeration units to maintain a product temperature of 38 F and the
freezers to maintain a product temperature of 0 F. See section 3.1 for control display information.

2.9 Installation Checklist

After the cabinet has been installed, leveled, and cleaned as described above, refer to the following check
list:
Warning: Cabinet MUST NOT SHARE A RECEPTACLE with another piece of equipment
Check for proper electrical hook-up.
Check that all clearances are in line with the aforementioned guidelines.
Check that cabinet is level.
* NOTE: Once the unit has been started and reaches proper storage temperatures, it may be
loaded with product. For proper energy efficiency and airflow we recommend a minimum1"
clearance between product and side walls, 4" clearance between product and ceiling, and 1"
clearance from the bottom of the unit.
809-114A Rev B
INSTALLATION
with clean water before drying with clean cloth.