Installation; Receiving And Inspection; Uncrating; Placement - Beverage-Air RI Series Installation, Operation And Troubleshooting Manual

Table of Contents

Advertisement

I
WARNING: If it is necessary to move the cooler after removal from the skid,
remove all doors and carefully push the unit at a point of no more than 36" from
the bottom to avoid damage. It is an NSF requirement that all rollin-in/roll-thru units
be sealed to the floor upon installation
2.1 Receiving and Inspecting
Prior to shipping, all Beverage-Air products are factory tested for performance and thoroughly inspected
to ensure they are free of any defects. Upon receipt, carefully examine the unit for any damage that may
have occurred during shipping and delivery. Any damage, discrepancies, overages, or shortages should
be noted on the carrier's Bill of Lading and a freight claim must be immediately filed with the carrier. If
damage is noted after receipt, contact the carrier's local terminal and file a freight claim. In either case, IT
IS IMPORTANT THAT ALL ORIGINAL CARTONS, CRATES, AND INTERIOR PACKAGING MATERIAL
ARE SAVED UNTIL INSPECTION HAS BEEN MADE BY THE DELIVERING CARRIER
NOTE: If the unit is laid down for any reason, the fluids in the compressor will drain out. To
prevent damage to the unit it MUST be allowed to sit upright for a minimum of One (1) hour prior
to starting up unit.

2.2 Uncrating

* Tools Needed: ¾" box wrench, adjustable wrench, level, flat head screw driver, and box cutter.
1. First, remove the cardboard top capping, all clear tape, and all staples including those at the b
bottom of the cardboard carton and skid.
2. Next, start from the top of the carton. Using the box cutter, carefully make one continuous
cut to the bottom of the skid. Remove cardboard carton and discard.
*Note: additional clear plastic protective wrap is applied directly to any product with a glass door.
3. Then, move unit as close to final position as possible before removing the skid.
WARNING: UNIT MUST BE BLOCKED AND SECURED WHEN
4. Finally, tip the unit forward and remove the skid. Remove the shipping bolts using the ¾" box
wrench while cabinet is held in one direction. Then repeat the process while the cabinet is held in
the opposite direction.

2.3 Placement

Consider the following when selecting a location for your cooler:
1. Clearance: 3" between the back of the cabinet and the wall
2. Floor Load: the floor on which the cooler is located must be even and level, free from
vibrations, and strong enough to support the combined weights of the unit and maximum
product load.
3. Ventilation
4. Power Outlet: Dedicated power outlet is located within 8 feet of length of cord.
809-114A Rev B

INSTALLATION

.
REMOVING SKID
7
2017-03-30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lv seriesRb seriesFb seriesRid series

Table of Contents