Set-Up; Roll In; Reach In; Leveling, Shelves And Bumper Install - Beverage-Air RI Series Installation, Operation And Troubleshooting Manual

Table of Contents

Advertisement

2.4 Cooler Set-up for Reach In units
With Legs or Casters
WARNING: unit must be blocked and secured prior to installing
1. Legs and casters must be screwed in by hand. Use the threaded holes located on the bottom
of the cabinet. None of the threads on the leg or caster stem should be visible once
screwed in. Once the caster cannot be turned any further, use the ¾' box wrench to
tighten the nut in between the mounting plate and the wheel of the caster until snug.
2. Tilt the cabinet in one direction approximately 8" and block it securely with pieces of 2x4
lumbers or other suitable material.
3. Screw in the two accessible legs/casters
4. Repeat this procedure with unit secured in the opposite direction so as to access the
remaining legs/casters
2.5 Leveling, Bumpers and Shelves
2.5.1
Leveling:
Cabinets must be leveled when installed. Level should be measured on the headrail.
Failure to level your cabinet may result in door not sealing, closing correctly, or
condensed water draining not draining properly.
For cabinets with legs, rotate the foot of the leg with an adjustable wrench to achieve
desired height for leveling.
For cabinets with casters, leveling can be achieved by placing large washers in between
2.5 Leveling, Bumpers and Shelves
2.5.2
Shelves:
All cabinets with shelves are supplied with pilasters and shelf clip supports. Shelves are
easily installed by inserting the shelf support clips into the pilasters so that they fit
tightly.
Adjust the shelf so that the smaller fill wires run from front to rear and the shelf frame
wire rest the shelf on the clips.
809-114A Rev B
INSTALLATION
the ½' stud and the holes located on the bottom of the case.
8
casters
2017-03-30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lv seriesRb seriesFb seriesRid series

Table of Contents