If you draw a connection incorrectly:
Click on the line of the incorrect interconnection and select Edit > Delete.
6.6.15

Interconnecting blocks in the "CFC_NP111"

Prerequisites
● The "CFC_NP111" CFC is open in the CFC Editor.
● All blocks are inserted, renamed and configured.
Procedure
1. Click "Start" output in the middle block "Motor".
2. Now, click "SimPV_in" input on the "FbkRun" block. The CFC Editor automatically creates
a line indicating the interconnection. The CFC should now appear as follows: