Current Status; Current State Of Your Project - Siemens SIMATIC PCS 7 SMART Getting Started

Process control system
Table of Contents

Advertisement

5.6

Current status

5.6.1

Current state of your project

Completed Configuration Tasks
So far, you have made the following settings for your project:
● You have created the "color_gs" project in SIMATIC Manager.
● You have configured the hardware components in HW Config.
● You have downloaded the hardware configuration from HW Config to the CPU.
● You have configured and loaded the PC station of the OS.
● You have entered settings in the plant hierarchy.
● You have mapped the plant structure of the "color_gs" project in the plant hierarchy.
PCS 7 SMART Getting Started - Part 1 (V9.0 with APL)
Getting Started, 12/2017, A5E42181435-AA
Initial work for the project
5.6 Current status
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents