Performing the additional task

11.1

Introduction to the additional task

Additional Task
In the "color_gs" project, two identically configured raw material tanks are required. The
additional task is to configure the second raw material tank "RMT2". You do not need to work
through all steps again but you will use the automatic functions of PCS 7 SMART. You will find
that the copying function of PCS 7 SMART will save you many steps by performing these steps
for you automatically in the background.
When you create the second raw material tank, you will work on your own. You have already
become familiar with many of the required dialog boxes during configuration of the first raw
material tank. In this section, we will not prescribe detailed step-by-step instructions but will
specify the order in which you must make the configuration. This gives you a general guideline
to proceed.