Quick Commissioning
Quick Commissioning wizard
The Quick Commissioning wizard includes zero point adjustment. Before entering the zero point wizard perform the following
steps in the plant:
1. Flush out any gases and obtain stable temperature conditions by running flow at operational conditions for minimum 30
minutes.
Figure 6-1
Best practice zero point adjustment with a by-pass line and two shut-off devices
2. Close the outlet shut-off valve while maintaining the system pressure. If bypass flow is necessary, open the bypass
valve. If the pressure can be increased by 1 to 2 bars with stopped flow, this should be applied.
3. Wait 1 to 2 minutes, for the system to settle, and then perform zero adjustment. Waiting longer can change the
temperature.
4. During the process a progress bar is visible in the LUI display.
5. At the end of the zero adjustment, the outcome is displayed as an offset and a standard deviation.
SITRANS FCT030 transmitter
A5E03922778-006, 12/2013
Options/description
Set the language: English, Deutsch, Français, Italiano, Español, Português,
РУССКИЙ, 汉语, Polski, Dansk, Svenska, Suomeksi
Information about the Quick Commissioning wizard
The set date and time (real time clock) is used for all time stamps of logged
information
The Quick Commissioning wizard comprises the most important
parameters/menus for quick configuration of the flowmeter