6. Assembly and hydraulic installation
assembly and hydraulic installation
6 .7. C on d ensati on r un - of f
Special measures must be taken for the condensation
that occures. It must be guaranteed in any case that
it is properly carried away or drained. The installed
heating band must be layed into the condensate run-
off line.
Outdoor device
Concrete base
Condensate flow
companing heating system
Well/Pipe
300mm
Canalisation
6 .8. C on n ec ti on of t h e c on d en s at ion r u n- of f
The enclosed corrugated hose (1,5 m) must be fi xa-
ted with the enclosed pipe clamp on the condensation
run-off adapter. The heating band (2 m) will be placed
in the drain hose. The condensation bin and the run-
off have to be checked for soiling regularly .
30
min. 200 mm
The minimum distances must be maintained
due to perform maintenance.
Installation instructions iPump A 3-11
6. 9 . M ini mu m di s t anc e s
When installing the outdoor unit, there must be spe-
cial attention to avoid air fl ow short circuit. Note by
assembly, that no air-bypass will develop between
the suction side and exhaust side. So it's not allowed
that the outdoor device is enclosed by four walls, so
the duct inlet or the duct outlet must be independent.
min. 500 mm
barrier
Suction side
min. 600 mm
min. 500 mm