Condensation Run-Off; Connection Of Condensation Run-Off; Minimum Distances - iDM AERO SLM 3-11 Technical Documentation Installation Instructions

Additional model: hgl without hgl with navigator 2.0 control air heat pump with inverter-technology
Table of Contents

Advertisement

5. Assembly and hydraulic installation
assembly and hydraulic installation
5 .8. Co n d en sa t ion r u n - of f
Special measures must be taken for the condensation
that occures. It must be guaranteed in any case that
it is properly carried away or drained. The installed
heating band must be layed into the condensate run-
off line.
Outdoor device
Concrete base
Condensate flow
companing heating system
Well/Pipe
300mm
Canalisation
5 .9. Co n n ection of c on de n sa t ion r u n - o f f
The enclosed corrugated hose (1,5 m) must be fi xated
with the enclosed pipe clamp on the condensation
run-off adapter. The heating band (2 m) will be placed
in the drain hose. The condensation bin and the run-
off have to be checked for soiling regularly
The minimum distances must be maintained due to perform maintenance.
32
min. 200 mm
Installation instructions AERO SLM
5. 1 0. M i nimu m di s t a nce s
When installing the outdoor unit, there must be spe-
cial attention to avoid air fl ow short circuit. Note by
assembly, that no air-bypass will develop between
the suction side and exhaust side. So it's not allowed
that the outdoor device is enclosed by 4 walls, so the
duct inlet or the duct outlet must be independent.
Suction side
min. 500 mm
Exhaust side
barrier
min. 600 mm
min. 500 mm
(C) IDM ENERGIESYSTEME GMBH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aero slm 6-17

Table of Contents