Managing Instrument Profiles; Use; Conducting A Visual Inspection; Inserting Or Removing The Gas Measuring Device Into Or From A Module - Dräger X-Dock 5300 Technical Manual

Hide thumbs Also See for X-Dock 5300:
Table of Contents

Advertisement

4.9

Managing instrument profiles

Select
> Data management > Devices.
The instrument overview is displayed.
Instrument no.
To create an instrument profile:
A new instrument profile will be created automatically as
soon as a gas instrument that is not yet stored in the station
is placed in a module.
5

Use

WARNING
!
A defective pressure reducer on the gas cylinder can
lead to increased pressure in the station. The gas
hoses may loosen as a result and gas may escape.
Health hazard! Test gas must not be inhaled. Observe
the hazard warnings in the relevant Safety Data
Sheets.
Provide venting into a fume cupboard
or outside the building.
NOTICE
i
i
To prevent loss of test gas, Dräger recommends
closing the test gas cylinders when the station is left
unattended for long periods.
Adjustment may not be possible due to instrument and
channel errors.
5.1

Conducting a visual inspection

A visual inspection of the gas measurement systems should be
conducted every time before being inserted into the station.
1. Check that the housing, external filters and the nameplates
are intact.
2. Check the battery contacts and sensor inputs for dirt.
NOTICE
i
i
Devices that have not passed the visual inspection
must not be inserted into the station. Otherwise the
test cannot be fully evaluated correctly.
Dräger X-dock 5300/6300/6600
5.2
◄ Instrument type
To insert the instrument in the module:
1. If necessary, push the lock up slightly and open the module
2. Place the instrument in the corresponding module.
3. Close the module cover.
To remove the instrument from the module:
1. Push the lock up slightly and open the module cover
2. Remove the instrument.
5.3
!
Inserting or removing the gas measuring
device into or from a module
cover upwards.
The instrument will be detected automatically.
X-am-125+ module with charging function only:
After the instrument is inserted, the charging status is
displayed for approx. 5 seconds via the charging status
LED.
The charging function starts automatically approx. 15
mintues after the last test.
upwards.
X-am 125+ module with charging function
(optional)
WARNING
Risk of explosion! Do not charge underground or in
explosion hazard areas. The X-am 125+ modules with
charging function are constructed in compliance with
regulations for fire-damp weather and explosion
protection.
It is only possible to charge the instrument batteries using
the X-am 125+ module with charging function.
The charging time is approx. 4 hours for a completely
empty battery.
A new NiMH supply unit reaches its full capacity after 3 full
charge/discharge cycles. Never store the device for
extended periods (max. 2 months) without a power supply
as the internal buffer battery will run down.omatically once
the temperature is back in charging range.
Use
2
1
00233286.eps
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X-dock 6300X-dock 6600

Table of Contents