Draw The Square While Doing The Tracking - Mitsubishi CR750-Q Series Instruction Manual

Tracking system and vision tracking system using mitsubishi robot
Hide thumbs Also See for CR750-Q Series:
Table of Contents

Advertisement

20.3.7. Draw the square while doing the tracking.

Here, explain the example which draws the outline of the following square workpiece on the basis
of the adsorption position.
Position of TrBase(P0)
Position to follow(PB)
The robot traces the outline of workpiece clockwise based on the position specified that the
following programs are executed by the TrBase instruction.
1 TrBase P0
2 TrRd P1,M1,MKIND
3 Trk On,P1,M1
4 Cnt 0
5 Mov P0, +20 ← Please specify -20 for RV robot though RH(SCARA) robot is +20.
6 Mvs P0
7 Mvs PA
8 Mvs PB
9 Mvs PC
10 Mvs PC, +20 ← Please specify -20 for RV robot though RH(SCARA) robot is +20.
11 Trk Off
' Specify the workpiece coordinate origin at the teaching position.
' Read the workpiece position data from the data buffer.
' Start tracking of a workpiece whose position measured by a sensor is
P1 and encoder value at that time is M1.
' End the tracking operation.
In such a case (improvement example) 20-107
20 Troubleshooting
Position to follow(PA)
Position to follow(PC)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents