Connecting The Ac Power Cable - Huawei PLC CCO01A User Manual

Table of Contents

Advertisement

PLC CCO01A
User Manual
Table 4-4
Table 4-4 Components to be configured in a third-party device scenario
Component
PLC CCO
Data collector
Knife switch
Socket
MCB

4.3.1 Connecting the AC Power Cable

Prerequisites
Before connecting the AC power cable, ensure that the upstream switch of the PLC CCO AC
power cable is turned off.
The AC power cable delivered with the PLC CCO is available.
Procedure
Step 1 Connect the PLC CCO AC power cable, as shown in
Issue 02 (2016-01-10)
The cable from the knife switch to the miniature circuit breaker (MCB) needs to be prepared by the
customer. Recommended cable: three-core multi-wire; operating voltage to the ground: ≥ 600 V;
operating voltage between cables: ≥ 1000 V; cross-sectional area of a single core: 4 mm
The cable from the busbar to the knife switch needs to be prepared by the customer. Recommended
cable: three-core multi-wire; operating voltage to the ground: ≥ 600 V; operating voltage between
cables: ≥ 1000 V; cross-sectional area of a single core: 4 mm
describes the components to be configured in a third-party device scenario.
Fuse
Knife switch
box
The AC power cable is 1.25 m long. If the AC power cable needs to be used, ensure that the PLC CCO is
no more than 1.15 m away from the port to be connected to the AC power cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
.
Model or
Specifications
PLC CCO01A
SmartLogger1000
Rated voltage: ≥ 600 V;
rated current: 6 A
Rated voltage: ≥ 600 V;
rated current: ≥ 6 A;
number of phases: three
Matches the power
adapter
Rated voltage: ≥ 480 V;
rated current: ≥ 6 A;
number of phases: three
Figure
4-9.
4 Electrical Connections
2
.
Quantity
1 PCS
1 PCS
3 PCS
1 PCS
2 PCS
1 PCS
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents