Page 1
Part Number: 31010VJY PLC CCO01A User Manual Issue Date 2016-01-10 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Purpose This document introduces the installation, operation, maintenance, and troubleshooting of the PLC CCO01A (PLC CCO for short). Get familiar with the PLC CCO features, functions, and safety precautions provided in this document before installing and operating the PLC CCO.
Do not remove or damage the bar code and label on the PLC CCO because they contain important product information. Installation Read this document before installation. Huawei shall not be liable for any consequence caused by violation of the regulations specified in this document. ...
Huawei technical support promptly. Checking the Product and Accessories After unpacking the PLC CCO, check whether the product and accessories are intact and complete. If any item is missing or damaged, contact the supplier or Huawei technical support. Table 3-1 shows the product and accessories included in the delivery.
(SUN2000 Communication Box Scenario) Prerequisites The holes planned for installing the PLC CCO meet the installation position requirements. This installation mode applies when the PLC needs to be installed inside a Huawei SUN2000 communication box. Context Installing the PLC CCO in a SUN2000 communication box is used as an example to illustrate the ear-mounting installation method.