Installing The Plc Cco Using Guide Rails (Third-Party Device Scenario) - Huawei PLC CCO01A User Manual

Table of Contents

Advertisement

PLC CCO01A
User Manual
Figure 3-3 Ear-mounting the PLC CCO
----End
3.5 Installing the PLC CCO Using Guide Rails
(Third-Party Device Scenario)
Prerequisites
The guide rails planned for installing the PLC CCO meet the installation position
requirements.
Issue 02 (2016-01-10)
Installation using guide rails applies when the PLC CCO needs to be installed in a third-party
box-type transformer. If this installation mode is selected, the PLC CCO installation space and
securing method need to be planned.
Guide rails are not delivered with the PLC CCO. If users want to mount the PLC CCO along guide
rails, they should prepare 35 mm standard guide rails by themselves.
dimensions.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Equipment Installation
Figure 3-4
shows the guide rail
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents