PLC CCO01A
User Manual
Figure 4-3 Cable routes (SUN2000 communication box scenario)
(1) AC power cable
4.2.1 Connecting the AC Power Cable
Prerequisites
Before connecting the AC power cable, ensure that the upstream switch of the PLC CCO AC
power cable is turned off.
The AC power cable is available. The cable can be:
Issue 02 (2016-01-10)
(2) RS485 communications cable
PLC CCO AC power cable delivered with the communication box. The cable number is
a
04092564-01
or XXXXXXXX-12
a: The corresponding communication box models are PDU8000-0010ACV5-CCA005 and
PDU8000-0010ACV5-CCA007.
b: The corresponding communication box models are PDU8000-0010ACV5-CCA002 and
PDU8000-0010ACV5-CCA003.
XXXXXXXX varies depending on the manufacturer.
AC power cable delivered with the PLC CCO.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
b
.
4 Electrical Connections
(3) Power adapter cable
20