Equipment Installation; Checking Before Installation - Huawei PLC CCO01A User Manual

Table of Contents

Advertisement

PLC CCO01A
User Manual

3.1 Checking Before Installation

Before unpacking, check that the product is intact. After unpacking, check that product and
accessories are complete.
Checking Outer Packing Materials
Check the outer packing materials for damage, such as holes and cracks, before unpacking the
PLC CCO. If any damage is found, do not unpack the PLC CCO and contact the supplier or
Huawei technical support promptly.
Checking the Product and Accessories
After unpacking the PLC CCO, check whether the product and accessories are intact and
complete. If any item is missing or damaged, contact the supplier or Huawei technical
support.
Table 3-1
Table 3-1 PLC CCO product and accessories
Name
PLC CCO
Support 1
Issue 02 (2016-01-10)
3
shows the product and accessories included in the delivery.
Exterior
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

Equipment Installation

Quantity
1 PCS
1 PCS
3 Equipment Installation
Description
N/A
Applies when a
guide rail is used
for the installation.
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents