Intec Turbo Force Hp3 40009 00 Instruction Manual page 7

Insulation blowing machine
Table of Contents

Advertisement

5. Place the Loading Platform in down position by first lifting up, then rotating downwards to rest
on top of the system's handle.
1. Lift Loading
Platform up.
6. Set Breaker Bar: The breaker bar is used to slice through cellulose resulting in enhanced hopper
utilization. When using stabilized cellulose, fiberglass, or stone wool, move the breaker bar up
to its highest position (or remove bar from system) so it does not interfere with product when
loading hopper.
7. Load Insulation -- Remove packaging and load insulation.
Cellulose:
1. Set bag on platform & remove plastic
wrapping. Be sure no plastic goes into
hopper.
netzerotools.com
Breaker Bar
Adjustment Settings
netzerotools.com
TURBO FORCE Instruction Manual
2. Rotate downwards
to rest on system's
handle.
Breaker Bar
2. Turn agitator on. Push bale thru bar &
into hopper.
|
6

Advertisement

Table of Contents
loading

Related Products for Intec Turbo Force Hp3 40009 00

Table of Contents