Slim Mbs Cabinet Clearance - Toshiba G9000 SERIES Installation And Operation Manual

Slim maintenance bypass
Hide thumbs Also See for G9000 SERIES:
Table of Contents

Advertisement

7.2

Slim MBS Cabinet Clearance

Maintain the indicated clearance during installation. See Figure 7.1. Ensure that the front and top air vents
are NOT blocked.
Side Clearance:
FIGURE 7.1
7.3 Wiring Between UPS & MBS
L1
L2
L3
N
FIGURE 7.2 - POWER CABLING BETWEEN SLIM MBS AND UPS
G9000 Slim MBS Installation and Operation Manual – 96011-000
0 in (0 mm)
CLEARANCE FOR SLIM MBS CABINET
MBS
A
B
C
A
B
C
NEUTRAL
N N N N
N
L1
L2
L3
TB1
1 2 3 4 5 6 7 8
Top 16 in
(406 mm)
Front
36 in
(914 mm)
Rear Clearance:
0 in (0 mm)
G9000 Series
UPS
A
H1
B
H2
C
H3
N
A
B
C
N
L1
L2
L3
+
-
24V DC PCB
CNEPO-2
P1 J1
CNEPO-1
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents