Before Proceeding - Follett HCD710ABS Installation Instructions Manual

Ice storage bins
Hide thumbs Also See for HCD710ABS:
Table of Contents

Advertisement

Louvered docking assembly
4
Install the louvered docking assembly.

BEFORE PROCEEDING

Prior to installing the louvered docking assembly, ensure that the
drain fitting is oriented (right or left) correctly for your installation.
An optional straight drain fitting is also supplied. You may need to
remove the back panel of the docking assembly in order to re-orient
or change the drain fitting. Replace back panel prior to mounting the
docking assembly.
Wall bracket accessory
Machine stand accessory
• Mount louvered docking assembly to wall
• Mount louvered docking assembly to
bracket accessory
machine stand accessory
BIN • RIDE Technology
self-contained
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents