Genie Super-Straddle Operator's Manual page 17

Hide thumbs Also See for Super-Straddle:
Table of Contents

Advertisement

Second Edition • First Printing
Test Retaining Pin Interlock
19 At the platform controls of the Genie AWP, pull
out the red Emergency Stop button.
20 Push in the control activate button and rotate
the up/down switch in the direction of intended
travel.
Result: The up/down functions should operate.
21 Remove a frame retaining pin from one corner of
the Super-Straddle. The corresponding interlock
display light should be off.
22 Push in the control activate button and rotate
the up/down switch in the direction of intended
travel.
Result: The up function should not operate.
23 Insert the frame retaining pin.
24 Repeat this procedure for each frame retaining
pin.
Part No. 133409
Test Outrigger Interlock
25 Pull out the red Emergency Stop button at the
platform controls.
26 Push in the control activate button and rotate
the up/down switch in the direction of intended
travel.
Result: The up/down functions should operate.
27 Unscrew one leveling jack until the
corresponding interlock display light turns off.
28 Push in the control activate button and rotate
the up/down switch in the direction of intended
travel.
Result: The up/down function should not
operate.
29 Return the leveling jack to the previous setting
and check the bubble level.
30 Repeat this procedure for each outrigger.
Super-Straddle
Operator's Manual
Inspections
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents