Genie Super-Straddle Operator's Manual page 15

Hide thumbs Also See for Super-Straddle:
Table of Contents

Advertisement

Second Edition • First Printing
Setup
1 Position the
Super-Straddle on a
firm, level surface.
2 Apply the brakes to
both swivel casters
on the base frame.
3 Remove the straddle
socket retaining
pins from the base
frames and
separate the base
frames.
4 Remove the ladder
from the base frame
cross member and
set it aside.
5 Release both swivel
caster brakes and
align the base frame
behind the Genie
AWP.
6 Remove all four
straddle sockets
from the base frame
and install them in
the Genie AWP
outrigger sockets.
The Genie AWP
must be fully
lowered.
Part No. 133409
7 Push the base
frame carefully
through all four
straddle sockets.
This may require
two people. Be sure
the straddle sockets
are over the
alignment spacers
on the base frame.
alignment spacer
8 Insert the straddle
socket retaining
pins through the two
straddle sockets
closest to the fixed
casters. Be sure the
holes are aligned
and the pin is
completely inserted.
9 Align the
telescoping base
frame in front of the
Genie AWP, and
then insert and push
it into the base
frame.
Super-Straddle
Operator's Manual
Inspections
base frame decal
133405 A
straddle socket
base frame
telescoping base frame
decal
133406 A
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents