NXP Semiconductors TWR-PXS2010 Quick Start Manual
NXP Semiconductors TWR-PXS2010 Quick Start Manual

NXP Semiconductors TWR-PXS2010 Quick Start Manual

Dual core power architecture mcu for industrial control and safety applications, tower system

Advertisement

Quick Links

Quick Start Guide
TWR-PXS2010
Dual Core Power Architecture MCU for
Industrial Control and Safety Applications
TOWER SYSTEM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TWR-PXS2010 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NXP Semiconductors TWR-PXS2010

  • Page 1 Quick Start Guide TWR-PXS2010 Dual Core Power Architecture MCU for Industrial Control and Safety Applications TOWER SYSTEM...
  • Page 2 Connector TWR-PXS2010 Freescale Tower System The TWR-PXS2010 module is part of the Freescale Tower System portfolio, a modular development platform that enables rapid prototyping and tool re-use through reconfigurable hardware. Elevate your design to the next level with this industrial power house by building your Tower System today.
  • Page 3 TOWER SYSTEM TWR-PXS2010 Features • Dual e200z4 CPU architecture • Dual processing spheres including: CPU, DMA, interrupt controller, crossbar and MPU for logic level fault detection • Two statically configurable modes of operation: Lockstep operation (redundant processing and calculations) and Dual Parallel Mode (independent core operation) • Fault Collection Unit, which monitors and manages fault events • Error correction coding on RAM and flash memory allows detection/ correction of memory errors • Designed to address safety requirements outlined in IEC61508 (SIL3) • A SafeAssure Solution SafeAssure Program: Functional Safety.
  • Page 4 DVD or at freescale.com/TWR-PXS20. Connecting Using the Serial TWR-SER to USB Bridge Insert the TWR-PXS2010 and TWR-SER The Freescale MC9S08JM60 serial boards into the primary and secondary to USB bridge solution provides a elevator board. The “primary” and RS-232 equivalent connection to “secondary”...
  • Page 5: Software Driver

    TOWER SYSTEM Installing the Running Software Driver Demonstration Code When the cable is plugged in for the first Press the RESET button on the board time, the Found New Hardware Wizard and follow the output information on the will start. Select the option Install from a terminal screen.
  • Page 6: Power Supply

    Quick Start Guide TWR-PXS2010 Jumper Options The following is a list of all jumper options. The default installed jumper settings are shown in white text within the blue boxes. General Jumper Configuration Jumper Function Enable/Disable CAN terminator resistor Enable/Disable potentiometer Enable/Disable OSJTAG interface bootloader mode...
  • Page 7 TOWER SYSTEM Boot Assistance Module (BAM) Configuration Jumper Position Function FAB connected to VDD ABS0 connected to VDD ABS1 connected to VDD J4-1, J3-2 FAB connected to GND J4-2, J3-4 ABS0 connected to GND J4-3, J3-6 ABS1 connected to GND CAN Configuration Jumper Position...
  • Page 8 Quick Start Guide Quick Start Guide Visit freescale.com/TWR-PXS20 for the latest information on the TWR-PXS20 module, including: • Board database: schematics, layout and BOM • User manual • Quick start guide • Software BSPs and CodeWarrior • Demos and tutorial • Fact sheet Support Visit freescale.com/support for a list of phone numbers within your region. Warranty Visit freescale.com/warranty for complete warranty information. For more information, visit freescale.com/Tower Join the online Tower community at towergeeks.org...

Table of Contents