3. Secure the two-point mounting plate and the L-shaped bracket to the ceiling with two
countersunk-head screws (M5 × 25) and two wing nuts and washers, see

Figure 2-16 Securing the Bracket

4. Align the two U-shape grooves of the ZXSDR R8119 with the two rivets on the two-point
hanging plate, and push the ZXSDR R8119 to the end to fix it on the two-point hanging
plate, see

Figure 2-17 Mounting the ZXSDR R8119

5. Install the ceiling board to the original location.
– End of Steps –