ZXSDR R8119 Hardware Installation
Context
For the installation components, refer to the following table.
Component
Two-point hanging board
L-shaped bracket
M5 × 25 countersunk- head
screw
Wing nut and washer
Steps
1. Remove the ceiling, mark the positions for drilling holes on the wall based the hole
positions of the L-shaped bracket, see
SJ-20150805085318-002|2016-08-18 (R1.3)
Quantity
Overview
1
1
2
2
Figure
2-12
2-14.
ZTE Proprietary and Confidential