Figure 2-14 Marking Holes; Figure 2-15 Hole Template Of The Removable Ceiling Board - Zte ZXSDR R8119 Hardware Installation

Pico remote radio unit
Table of Contents

Advertisement

Figure 2-14 Marking Holes

2. On the removed ceiling, drill two mounting holes and one network cable hole,
seeFigure

Figure 2-15 Hole Template of the Removable Ceiling Board

1. Installation hole of the
network cable
The network cable hole must be drilled in accordance with the size specified on the
hole template. If the hole size is smaller than that of the template hole, the network
cable will be stuck when the ZXSDR R8119 is dismounted.
SJ-20150805085318-002|2016-08-18 (R1.3)
2-15.
Caution!
Chapter 2 Installing the ZXSDR R8119
2. Installation hole of
the two-point hanging
board
2-13
ZTE Proprietary and Confidential

Advertisement

Table of Contents
loading

Table of Contents