Table Of Contents - McQuay AGZXXXBS Series Installation, Operation And Maintenance Manual

Air-cooled scroll compressor chiller
Table of Contents

Advertisement

Table of Contents

Introduction ....................................... 3
General Description......................................3
Inspection .....................................................3
Nomenclature ...............................................3
Installation ......................................... 4
Handling .......................................................4
Location........................................................5
Vibration Isolators ......................................12
Water Piping...............................................14
Flow Switch................................................16
Water Connections......................................17
Variable Speed Pumping ............................17
Glycol Solutions .........................................17
Wind Baffles and Hail Guards....................23
Optional Features ............................ 25
Physical Data ................................... 28
Dimensional Data ............................ 51
MicroTech II Controller ................. 54
Overview ....................................................55
General Description....................................55
Logging ......................................................59
Control Logic .............................................60
Chilled Water Pump Control ......................61
Illustrations and data cover McQuay International products at the time of publication and we reserve the right to
2
This manual also replaces
IOMM AGR-1
Our facility is ISO Certified
"McQuay" is a registered trademark of McQuay International
2002 McQuay International
make changes in design and construction at anytime without notice.
AGZ 026B through 130B
Compressor Control................................... 61
Condenser Fan Control .............................. 65
Optional Low Ambient VFD...................... 67
Using the Controller .................................. 77
Startup ..............................................91
Pre Start-up ................................................ 91
Start-Up ..................................................... 91
Shutdown ................................................... 92
Water Piping Checkout .............................. 92
Refrigerant Piping Checkout...................... 92
Electrical Check Out.................................. 93
Operation..........................................93
Hot Gas Bypass (Optional) ........................ 93
Filter-Driers ............................................... 94
System Adjustment .................................... 94
Liquid Line Sight Glass ............................. 94
Refrigerant Charging ................................. 95
Thermostatic Expansion Valve .................. 95
Crankcase Heaters ..................................... 95
Evaporator ................................................. 95
Unit Maintenance.............................96
Service...............................................98
Liquid Line Solenoid Valve ....................... 98
Evaporator ................................................. 99
Refrigerant Charging ................................. 99
Warranty Statement ......................100
IOMM AGZ-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents