Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Baker Hughes Manuals
Valve Positioners
Masoneilan SVI II AP
Quick start manual
Baker Hughes Masoneilan SVI II AP Quick Start Manual
Digital positioner, advanced performance
Hide thumbs
Also See for Masoneilan SVI II AP
:
Instruction manual
(16 pages)
,
Quick start manual
(92 pages)
,
Quick start manual
(32 pages)
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
page
of
108
Go
/
108
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
1 : Safety Information
Safety Symbols
SVI II AP Product Safety
2 : Installation and Set up
Introduction
Using the Quick Start Guide
Single Acting Positioner
Double Acting Positioner
Pushbuttons and Local Display
Pushbuttons
Valvue* Software
System Requirements
Valvue and SV II AP DTM DTM Trial Version
Masoneilan Software Download
Mounting the SVI II AP
Necessary Precautions
Mounting the SVI II AP on Rotary Valves
Travel Sensor Alignment
Mounting the SVI II AP on Reciprocating Valves
Checking the Magnet
Installing the SVI II AP for Double- Acting Operation
Connecting the Tubing and Air Supply
Natural Gas Supply Considerations
Installation Procedure
Connecting the Air Supply
Wiring the SVI II AP
Connecting to the Control Loop
Wiring Guidelines
SVI II AP Setups
Grounding Practices
Compliance Voltage in Single Drop Current Mode
Verify Wiring and Connections
3 : Check Out, Configuration and Calibration
Overview
Check out Procedures
Inspecting Actuator, Linkages, or Rotary Adapter
Verifying Mounting and Linkage Adjustment
Checking the Magnet
Checking the Air Supply
Checking the Electronic Module Connections
Operational Checkout
Connecting to the Current Source
Powering up the SVI II AP
Configuration
Configuration with Pushbuttons
Viewing Status Messages
VIEW DATA Settings
Calibration
Check-Out with a HART® Handheld Communicator
4 : Maintenance
SVI II AP Maintenance
Repair
Tools Needed for Cover Replacement
Display Cover Removal and Installation
A: Specifications and References
Physical and Operational Specifications
Hazardous Location Installation
Spare Parts
B: Optional Switch Load Limits
General Configuration Notes
C: Burst Mode Operations
D: Determining an SVI Positioner Compliance Voltage in a Control System
Compliance Test Set-Up
Advertisement
Quick Links
1
Single Acting Positioner
2
Calibration
3
Svi II Ap Maintenance
4
Physical and Operational Specifications
Download this manual
Masoneilan *
SVI * II AP Digital Positioner
Advanced Performance
Quick Start Guide (Rev. W)
BHGE Data Classification: Public
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Related Manuals for Baker Hughes Masoneilan SVI II AP
Valve Positioners Baker Hughes Masoneilan SVI II AP Quick Start Manual
Advanced performance digital positioner (92 pages)
Accessories Baker Hughes Masoneilan SVI II AP Quick Start Manual
Remote position sensor (rps) (32 pages)
Valve Positioners Baker Hughes Masoneilan SVI II AP Instruction Manual
Advanced performance digital positioner bench quick start (16 pages)
Valve Positioners Baker Hughes Masoneilan SVIII AP Installation And Maintenance Manual
Digital positioner (204 pages)
Valve Positioners Baker Hughes Masoneilan SVI FF Quick Start Manual
Advanced performance digital positioner bench quick start (rev e) (23 pages)
Valve Positioners Baker Hughes Masoneilan SVI FF Quick Start Manual
Digital positioner (24 pages)
Valve Positioners Baker Hughes Masoneilan SVI II AP Series Quick Start Manual
Advanced performance digital positioner (124 pages)
Valve Positioners Baker Hughes Masoneilan SVi 1000 Instruction Manual
(128 pages)
Valve Positioners Baker Hughes Masoneilan SVi 1000 Quick Start Manual
(68 pages)
Valve Positioners Baker Hughes Masoneilan SVI 3 Quick Start Manual
Digital positioner (24 pages)
Valve Positioners Baker Hughes Masoneilan 4700P Instruction Manual
Pneumatic and electropneumatic positioners (66 pages)
Valve Positioners Baker Hughes Masoneilan 51 Series Instruction Manual
Cylinder actuator (40 pages)
Valve Positioners Baker Hughes Masoneilan 4700E Instruction Manual
Electropneumatic positioners (12 pages)
Valve Positioners Baker Hughes Masoneilan 47 P Series Instruction Manual
Electropneumatic positioner (15 pages)
Valve Positioners Baker Hughes Masoneilan SVI3 Instruction Manual
Digital positioner advanced performance (123 pages)
Valve Positioners Baker Hughes Masoneilan SVi1000 Instruction Manual
Advanced performance digital positioner bench quick start (16 pages)
Summary of Contents for Baker Hughes Masoneilan SVI II AP
Page 1
Masoneilan * SVI * II AP Digital Positioner Advanced Performance Quick Start Guide (Rev. W) BHGE Data Classification: Public...
Page 2
MENT SHALL NOT BE REPRODUCED IN WHOLE OR IN PART TO ANY THIRD PARTY WITHOUT THE WRITTEN APPROVAL OF BHGE. Copyright Copyright 2018 by Baker Hughes, a GE company LLC. All rights reserved. PN 055201-167 REV W. © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 3: Table Of Contents
Wiring the SVI II AP ..........................41 Connecting to the Control Loop .......................42 Wiring Guidelines ............................43 SVI II AP Setups ............................44 Grounding Practices ..........................44 Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 3 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 4
B: Optional Switch Load Limits ............95 General Configuration Notes......................95 C: Burst Mode Operations ..............99 D: Determining an SVI Positioner Compliance Voltage in a Control System ......................103 Compliance Test Set-Up ........................103 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 4 | =BHGE...
Page 5
Added notes for PV and DI to card interface drawing. Change ESS-699 to Rev AD. W/01-2018 Updated Optional Switches section. =| 5 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 6
This page intentionally left blank.
Page 7: 1: Safety Information
Indicates important facts and conditions. NOTE Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 7 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 8: Svi Ii Ap Product Safety
Before using these products with fluids/compressed gases other than air or for non-industrial applications, consult the factory. This product is not intended for use in life support systems. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 8 | =BHGE...
Page 9
Changes to specifications, structure, and components used may not lead to the revision of this manual unless such changes affect the function and performance of the product. =| 9 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 10
This page intentionally left blank.
Page 11: 2: Installation And Set Up
(not available for the High Flow version) and a remote mount position-sensing mechanism. Using ® HART eDDL and FDT-DTM technologies, the Masoneilan SVI II AP digital valve positioner pro- vides interoperability with leading control systems suppliers. Figure 1 SVI II AP Digital Positioner Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 11 ©...
Page 12
Pneumatic Relay Figure 2 SVI II AP Components Manifold Cover (I/P Module) Relay Electronics Module SVI II AP Cover Figure 3 SVI II AP High Flow Components © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 12 | =BHGE...
Page 13: Using The Quick Start Guide
Connect the positioner to the HART See page 42 for instructions. Control Loop segment by installing the SVI II AP wiring. =| 13 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 14
Before installing, using, or carrying out any maintenance tasks associated with this instrument, READ THE INSTRUCTIONS CAREFULLY. Refer to “Hazardous Location Installation” on page 76 of this guide for detailed instructions. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 14 | =BHGE...
Page 15: Single Acting Positioner
+5 psi. Output Supply Figure 4 Air Ports on Single Acting Positioner =| 15 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 16: Double Acting Positioner
II) to Connect Output 1, labeled( the opposing actuator port (see Figure 6). Output I Output II Supply Figure 6 Air Ports on Double Acting Positioner © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 16 | =BHGE...
Page 17: Pushbuttons And Local Display
When used to increase a displayed value holding this button down causes the value to increase at a faster rate. =| 17 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 18
When an exclamation point (!) appears in the SVI II AP display window, it indicates that there is instrument status available. (Forward) (Back) (Select) Figure 7 SVI II AP Display Pushbuttons © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 18 | =BHGE...
Page 19
Security Level 0 Lock Out All Buttons: The buttons are disabled (level 0). =| 19 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 20
DTM or DD. The input to the switch can be automated by sending Device Variable 8 (DI) via CMD 9 or CMD 33 from a DCS. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 20 | =BHGE...
Page 21: Valvue* Software
Trend setpoint, valve position, actua- Display comparative test results (full tor pressure version only) Perform diagnostic test procedures (full version only) =| 21 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 22: Masoneilan Software Download
The results appear (red box in Figure 9). 2. Use the arrows to move through the selections. Select Download below ValVue V3.30 Installer Download and Figure 10 appears. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 22 | =BHGE...
Page 23
If you are upgrading from ValVue 2.x you must update the SQL database location to match ValVue3’s. 5. Double-click on the installer and follow the instructions to install. =| 23 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 24
Figure 11 Download Center: Search for SVI II AP DTM The results appear (Figure 11). 2. Select Download below SVI II AP DTM and Figure 12 appears. Figure 12 Opening Dialog © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 24 | =BHGE...
Page 25
5. Double-click on the installer and follow the instructions to install. =| 25 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 26: Mounting The Svi Ii Ap
It is now safe to disconnect and remove any valve mounted equipment that is being replaced. For the procedure to mount rotary and reciprocating valves, refer to the Mounting Instructions contained in the valve’s Mounting Box kit. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 26 | =BHGE...
Page 27: Mounting The Svi Ii Ap On Rotary Valves
0.06 in. (1.524 mm). =| 27 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 28
10. Ensure no interference exists with the position sensor protrusion. 11. Ensure that the V-Seal makes contact with the skirt around the position sensor protrusion on SVI II AP housing. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 28 | =BHGE...
Page 29: Travel Sensor Alignment
Any amount of rotation 50% Travel 0 +/- 1000 other configura- Clockwise or counter- (Mid-Stroke) tions clockwise (0°) =| 29 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 30: Mounting The Svi Ii Ap On Reciprocating Valves
M5 flat head screw to ensure that the magnet axis is vertical when the lever is in the valve closed position. Tighten the lever screw securely. Refer to Figure 14. M5 Flat head screw Figure 14 Magnet Holder for Reciprocating Valves © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 30 | =BHGE...
Page 31
9. Attach the left hand threaded rod end to the take-off rod with 1⁄4 - 20 UNC nut and thread the left hand lock nut onto the rod end. =| 31 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 32
13. Mount the SVI II AP to the bracket and secure with four M6 socket head cap screws. Figure 17 Lever for Masoneilan Model 87/88 Multispring Actuator © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 32 | =BHGE...
Page 33
To remove the SVI II AP Controller from a reciprocating valve perform Steps 1 - 12 on page 30 in the reverse order. =| 33 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 34: Checking The Magnet
Performing a Visual Inspection To perform a visual inspection refer to Table 3 on page 29 and ensure that the magnet is correct- ly oriented for the actuator/valve configuration. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 34 | =BHGE...
Page 35: Installing The Svi Ii Ap For Double- Acting Operation
Mount all components snug enough to stay in place but loose enough to tap with rubber hammer into final position. =| 35 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 36
For bottom: hex nut regular 1/4-20 and hex screw 1/4-20 UNC x 22.2 [.88] LG. Figure 20 Bracket Configuration Strokes .5 - 2.50” and 3-6” © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 36 | =BHGE...
Page 37
8. Cycle the valve open to close verifying proper components movement and that rod-ends move free and clear from other components. =| 37 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 38: Connecting The Tubing And Air Supply
Natural gas may be contained within the SVI II AP. Even after disconnecting the SVI II AP from all the pneumatic connections Natural Gas may still be present within the SVI II AP. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 38 | =BHGE...
Page 39
Isolate the valve from the process and disconnect air tubing from the positioner. Disconnect air fully to avoid injury or process damage. =| 39 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 40: Installation Procedure
The SVI II AP High Flow digital valve positioner cannot be placed in parallel with another volume booster. Contact the factory for further instructions regarding configuration with boosters as well as other non-standard configurations. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 40 | =BHGE...
Page 41: Connecting The Air Supply
CAUTION Refer to “Optional Switch Load Limits” on page 95 for guidelines on safely wiring switch load limits. =| 41 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 42: Connecting To The Control Loop
Ensure the minimum AO current is 3.2 mA. If the module loses power and the AO circuit remains powered, the AO signal will be 3.2 mA. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 42 | =BHGE...
Page 43: Wiring Guidelines
Ensure that the position retransmit signal is connected to the control system’s analog input card. Ensure the control loop is powered while making make measurements with a meter. =| 43 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 44: Svi Ii Ap Setups
If the valve is stable in MANUAL mode then the problem can be noise in the control system. Recheck all wiring connections and ground points. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 44 | =BHGE...
Page 45: Compliance Voltage In Single Drop Current Mode
Grounding the case is unnecessary for functional purposes but grounding the case may be necessary to conform to local codes. =| 45 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 46
Supply 220 Ohms HART® compliant control system output card HART® Modem ValVue DPI620 Figure 23 General Purpose and Explosion Proof Installation Figure 24 Intrinsically Safe Installation © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 46 | =BHGE...
Page 47: 3: Check Out, Configuration And Calibration
The SVI II AP cover must be in place and secured CAUTION using all four screws during operation. Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 47 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 48: Inspecting Actuator, Linkages, Or Rotary Adapter
Check that the bracket is mounted using the proper holes (refer to Table 4 on page 33). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 48 | =BHGE...
Page 49
At mid-travel, the value should be between –1000 and +1000 for a greater than 60° rotation rotary valve. =| 49 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 50: Checking The Air Supply
Positioner Model Number SVI II AP-2 SVI II AP-3 4 - 20 mA Input Setpoint Display/ Pushbuttons Optional Optional Remote Mount Input © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 50 | =BHGE...
Page 51
The PV (Process Variable is not used for the SVI II AP. The Digital Input (DI) is activated using SMARTs Assistant, which is downloaded at https://www.geoilandgas.com/file-download- search. =| 51 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 52: Operational Checkout
The current source must be a true high impedance current limiting device. A proper current source explicitly enables adjustment of the current in mA, not V. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 52 | =BHGE...
Page 53
If the SVI II AP is specified without local pushbuttons and display, local operation is not available. Configure and calibrate with ValVue and a HART modem. ® =| 53 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 54: Configuration
DD. Previous firmware versions reported this as TuneFail. These messages do not mean the positioner is defective but indicate a need to perform a manual tune. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 54 | =BHGE...
Page 55
Once you have a preferred aggressiveness and you tune once, all future autotunes automatically use that same value, until user- changed. =| 55 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 56: Configuration With Pushbuttons
If a change is made in the Air-to-Open / Air-to-Close configuration option or if you move the SVI II AP to a different valve or make any change to the valve position linkage, you must run the find STOPS calibration again. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 56 | =BHGE...
Page 57
Figure 28 CONFIGure Menu =| 57 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 58: Viewing Status Messages
EQUAL 30 EQUAL 50 QUICK 50 CUSTOM CAMFXEQ 0.00 2.00 TS OFF TS ON 4.00 4.00 SIG LO SIG LO 20.00 12.00 SIG HI SIG HI English French © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 58 | =BHGE...
Page 59: Calibration
5. Press * to cause the valve to stroke and to automatically calibrate valve travel. 6. After the STOPS procedure finishes, press + twice until TUNE appears. =| 59 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 60
SVI II AP to a different valve or make any change to the valve position linkage, you must run the find STOPS calibration again. Figure 29 CALIBration Menu © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 60 | =BHGE...
Page 61
3. Press + repeatedly until SETUP appears. CALIB appears. 4. Press * to return to SETUP menu; =| 61 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 62
View ERR CLR ERR Setup Data MAN POS <value> * - + Manual Calib Config Config Calib Menu Menu Figure 30 NORMAL Operation and MANUAL Menu Structures © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 62 | =BHGE...
Page 63: Check-Out With A Hart® Handheld Communicator
Process applied to the non-primary variable is outside the operating limits of the field device =| 63 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 64
(Position Error, for example) or go to the troubleshooting guide. 14. Correct the problem (Is the air supply on?), and then go to clear status until Clear Fault codes Completed appears. 15. Press OK. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 64 | =BHGE...
Page 65: 4: Maintenance
Tools Needed for Cover Replacement 5 mm hex key for the cover 3 mm hex key for the lanyard Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 65 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 66: Display Cover Removal And Installation
1. Using a 5 mm Hex key unscrew the four screws around the perimeter of the SVI II AP cover. 2. Lift the cover off the positioner. Display Cover Pneumatic Cover Figure 32 SVI II AP Pneumatic and Display Covers © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 66 | =BHGE...
Page 67
3. The flange area is not corroded and the surface is not scarred. 4. The four cover bolts are securely tightened to 50 in/lb. =| 67 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 68
This page intentionally left blank.
Page 69: A: Specifications And References
1 G at 150 - 2000 Hz - Less than 2% of span Magnetic Field Influence Negligible at 30 A/m (EN61000-4-8) CE MARK certified to EN50081-2 and EN50082-2 Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 69 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 70
SV = Actuator Pressure (P1-P2) (N/A for standard diagnostic version; units sends zero) TV = Supply Pressure QV = P2 for double acting units (N/A for standard diagnostic version; units sends zero) © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 70 | =BHGE...
Page 71
430 stainless steel, PPS, 300 series stainless steel Mounting Bracket 300 series stainless steel Magnet Holder Corrosion Protected Anodized Aluminum 6061 T6 =| 71 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 72
0%, and put the process control system in manual, for smooth recovery from air supply failure. Loss of Input Signal Actuator Output fails to atmosphere Output Pressure 0-150 psi (10.3 bar) max. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 72 | =BHGE...
Page 73
Loss of Input Signal Output drops to low pressure. Output Pressure 0-150 psi (10 bar) max =| 73 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 74
Always set control set point to 0%, and put the process control system in man- ual, for smooth recovery from air supply failure. Output 1 fails to atmosphere Loss of Input Signal Output 2 fails to supply pressure. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 74 | =BHGE...
Page 75
1. ATEX/FM/CSA/Intrinsic Safety & Exprf 4. ATEX (IS, NI) Approved Configuration Codes SVI2 AP- Figure 33 SVI II AP Model Numbering =| 75 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 76: Hazardous Location Installation
The following pages provide the agency approved installation procedure for hazardous locations. NOTE The installation procedure is accurate at time of print. For further hazardous installation information please consult the factory. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 76 | =BHGE...
Page 77
Wiring must be rated for at least 5ºC above the highest expected ambient temperature. ES-699 Rev AD Page 1 of 13 =| 77 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 78
5. Verify that the markings on the label are consistent with the application. 6. Verify that the air supply pressure cannot exceed the marking on the respective label. ES-699 Rev AD Page 2 of 13 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 78 | =BHGE...
Page 79
Carbon Disulphide is excluded. (IEC 60079-1, Clause 15.4.3.2.2., carbon disulphide is excluded for enclosures with a volume greater than 100cm3) ES-699 Rev AD Page 3 of 13 =| 79 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 80
5.4 Category II 1 (Zone 2) When installing in Category 3 (Zone 2) areas using ‘ic’ protection, ‘ic’ safety barriers are required. ES-699 Rev AD Page 4 of 13 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 80 | =BHGE...
Page 81
30 V, 4-20 m A, 10 .3 BA R (15 0 PSI ) : -40 ° C to +85 º C ES-699 Rev AD Page 5 of 13 =| 81 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 82
II 3G Ex ic IIC T6..T4 Gc {Intrinsically Safe, gas} II 3D Ex tc IIIC T96°C Dc {Protection by Enclosure, dust} ES-699 Rev AD Page 6 of 13 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 82 | =BHGE...
Page 83
SVI2-abcdefgh (see section 3 above for explanation) 6.9 Serial Number: SN-nnyywwnnnn ES-699 Rev AD Page 7 of 13 =| 83 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 84
Solendoid Control System DI to Control System SEE NOTE 8.6 LOAD SEE NOTE 8.6 Applies to ‘ia’ and ‘ic’ ES-699 Rev AD Page 8 of 13 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 84 | =BHGE...
Page 85
Vmax = 30 Vdc; Imax = 125 mA; Ci = 8 nF; Li = 1 uH max = 900 mW. ES-699 Rev AD Page 9 of 13 =| 85 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 86
Uo/Voc = 6.5 Volts Io/Isc = 72 mA Ca = 1.25 uF La = 2 mH Connect only to passive (Un-powered) switch. ES-699 Rev AD Page 10 of 13 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 86 | =BHGE...
Page 87
Secure the four cover bolts by applying a torque of 55±5 in-lbs. ES-699 Rev AD Page 11 of 13 =| 87 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 88
The three mounting screws are snug. 9.5 Pneumatic Cover Make sure that: The gasket is seated in the groove. The retaining screws are snug. ES-699 Rev AD Page 12 of 13 © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 88 | =BHGE...
Page 89
03JUN13 ADR-003984 22APR15 ADR-004071 06OCT15 PDR ECO-0026891 28OCT16 PDR ECO-0029774 15NOV17 ES-699 Rev AD Page 13 of 13 =| 89 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 90: Spare Parts
Spare Parts © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 90 | =BHGE...
Page 91
=| 91 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 92
© 2018 Baker Hughes, a GE company, LLC. All rights reserved. 92 | =BHGE...
Page 93
REF NO 2-025 720020224-681-0000 O-RING ID 9.137.82 [1.498] WIDTH 1.78 [0.0703] REF NO 2-029 720014540-779-0000 Instructions 720009638-999-0000 RELAY SA HCR =| 93 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 94
This page intentionally left blank.
Page 95: B: Optional Switch Load Limits
1 V (Switch saturation voltage) 30 VDC max. SWITCH 0.200 mA (Switch leakage current) 1 A max. SWITCH Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 95 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 96
1 A at all times. Some 3rd party devices, such as incandescent lamps or solenoids, require surge and back EMF protection to prevent voltage spikes. © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 96 | =BHGE...
Page 97
SVI II AP Switch Output: 1 V Voltage with switch ON Source Figure 35 Simplified Switch Installation Drawing: Correct Configuration =| 97 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 98
Option #2. The barrier must have adequate resistance to limit inrush current, as the fuse cannot limit inrush current (see Wiring Option #2). © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 98 | =BHGE...
Page 99: C: Burst Mode Operations
Choose the Burst command variables to be returned by referring to list of device variables in Table 16. Figure 37 Burst Mode Configuration Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 99 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 100
Digital Input Percent (0% = " off, 100% = on) Temperature Board temperature Celsius " Reserved Reserved Reserved " Raw Position Raw valve position Counts " © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 100 | =BHGE...
Page 101
Upper limit for valve travel Percent " Adjustment Percent of Analog Input current sig- Percent " Range nal in percentage =| 101 Masoneilan SVI II AP Digital Positioner Quick Start Guide © 2018 Baker Hughes, a GE company, LLC. All rights reserved...
Page 102
This page intentionally left blank.
Page 103: D: Determining An Svi Positioner Compliance Voltage In A Control System
4. Read the voltage across the potentiometer, which should be > 11 VDC. This is the available system voltage at the minimum output. Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 103 © 2018 Baker Hughes, a GE company, LLC. All rights reserved.
Page 104
9.5 to 10.5 V 12 mA 10 V 9 to 10 V 16 mA 9.5 V 8.5 to 9.5 V 20 mA 8 to 9 V © 2018 Baker Hughes, a GE company, LLC. All rights reserved. 104 | =BHGE...
Page 105
This page intentionally left blank.
Page 106
This page intentionally left blank.
Page 107
This page intentionally left blank.
Page 108
Baker Hughes, a GE company and the GE monogram are trademarks of the General Electric Company.Denotes a trademark of the General Electric Company.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL