4.1 Storage

SafeLink units must be stored under cover in a dry and well-ventilated area.

4.2 Transporting

SafeLink units are shipped from the factory filled with SF
installation. All units have passed routine tests before leaving the factory.
The switchgear is filled with SF
Bolts, nuts, connections etc associated with sealing must not be adjusted.
The units are supplied packed on a pallet or concrete pad to allow forkhoist movement.
Lifting eyes are also provided as standard. Where the unit is supplied with an enclosure
this is generally supplied as a flat-pack to be fitted to the SafeLink following
installation.

4.3 Inspection of Unit

On receipt of the unit, it should be checked for any visible signs of damage. Damage to
paintwork, etc should be made good as soon as possible. Check that the gas density
gauge is in the green region.
If there are any problems with your SafeLink unit please contact your ABB agent.
4.4 Dimensions & Weights
SafeLink with ABB stand:
Width:
Height:
Depth:
Weight:
Optional outdoor enclosure:
Width:
Height:
Depth:
Weight:
Optional concrete mounting pad:
Width:
Height:
Depth:
Weight:
Rated Seismic Load:
ABB Ltd, Switchgear Division, Auckland, New Zealand
SF
Installation and Operating Instructions
4 Transport & Handling
gas to a pressure of 0.2 bar above atmosphere at 20°C.
6
720mm
1350mm
700mm
250kg
810mm
1384mm
838mm
80kg
940mm
150mm
850mm
230kg
Suitable for all areas in NZ
SafeLink
Insulated Ring Main Unit
6
gas and ready for
6
13