Pre-Operation Checklist; Placement - HARVEST FC1545 Operator's Manual

Field conveyor
Table of Contents

Advertisement

!
3B Pre-Operation Checklist
BEFORE OPERATING THE CONVEYOR EACH TIME:
Service the machine per the schedule outlined in the Maintenance section of this
manual.
The conveyor belt should slide freely inside the tube.
All guards and shields should be in place.
Check tires for proper inflation and ensure they are in safe road condition.
Check the conveyor belt for tension, alignment, and condition.
Check the condition of the belt lacing and the lacing pin.
Check drive belt for tension, alignment, and condition.
Check and clear the conveyor of any obstructions at intake or discharge end.
Check winch cable for fraying. Replace immediately if there is any fraying.
Check winch brake. Repair if necessary.
Anchor intake end of support discharge end of conveyor when in position.
!
3C Placement
Moving the Conveyor with a Towing Vehicle into or out of the Working Area
1. Clear the area of all debris.
2. Always use a vehicle when moving the conveyor. When raising from or attaching to
vehicle, test the intake end for downward weight. Lift slowly and keep intake end
no higher than the tow vehicle's hitch. Be sure all product is emptied from
conveyor before lifting.
!
WARNING: Never move the conveyor by hand. Do not push on the conveyor
undercarriage.
!
3. Conveyor must be on level surface attached to vehicle with wheels free to move.
4. If conveyor must be raised before placement, ensure the entire area above the
conveyor and in the line of travel is clear of obstructions and electrical wires.
!
_
_
! 13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fc1535

Table of Contents