!
5. Maintenance
Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.
5A Maintenance Schedule
10 Hours (Daily)
All Roller Bearings
Drive Belt Tension
Conveyor Belt Tension & Alignment
Drive Chain Tension
Conveyor Belt Lacing
!
!
50 Hours (Weekly)
Drive Chain
Flange Bolt Tightness
100 Hours (Annually)
Wheel Bearings, Repack if Necessary
!
!
_
! 2 2