Unit Inspection Upon Delivery; Inspect The Package; Unpacking And Inspection Of The Unit; Unit Handling - Lowara e-HM series Installation, Operation And Maintenance Manual

Multistage horizontal pump unit
Table of Contents

Advertisement

2.2 Unit inspection upon delivery

2.2.1 Inspect the package

1. Check that quantity, descriptions and product codes match the order.
2. Check the packaging for any damage or missing components.
3. In case of immediately detectable damage or missing parts:
In both cases, promptly contact Xylem or the Authorised Distributor from whom the
product was purchased.

2.2.2 Unpacking and inspection of the unit

CAUTION: Cut and abrasion hazard
Always wear personal protective equipment.
1. Remove packing materials from the product.
2. Release the unit by removing the screws and/or cutting the straps, if fitted.
3. Check the unit for integrity and to make sure that there are no missing components.
4. In case of damage or missing components, promptly contact Xylem or the Authorised
Distributor.

2.3 Unit handling

The unit must be harnessed and lifted as shown in the figure.
Figure 2: Lifting of the unit
WARNING:
Use cranes, ropes, lifting straps, hooks and clasps that comply with current regulations
and that are suitable for the specific use.
NOTICE:
Make sure that the harnessing does not hit and/or damage the unit.
e-HM Series Installation, Operation and Maintenance Manual
– accept the goods with reserve, indicating any findings on the transport document,
or
– reject the goods, indicating the reason on the transport document.
2 Transport and storage
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents