®
Prothrombin Time (PT)/INR Monitoring System Self-Test User's Manual
Coag-Sense
Action
bubbles in the transfer tube.
9.
Rest hand on instrument to
steady. Move fingers to flat
sides of bulb being sure to
cover air hole. Insert tip into
sample application well of
test strip, touching tip down
on strip at flashing green
light. Squeeze bulb until
solution leaves tube.
Note ◙: Keep pressure on
bulb and pull away from strip
(avoids back suction)
10. When the control strip
activation solution is
properly applied and
detected the flashing green
light will turn off, and the
meter display looks like this.
Note ◙: If this screen is not displayed, either not enough solution
was applied or the solution had bubbles in it. Remove the
strip. Retest with a new control strip. Do NOT attempt to add
more solution to the control strip.
11. When the low control testing
is complete, the display
shows "OK" and looks
similar to this.
Page 22
Meter Display
For In Vitro Diagnostic Use
TESTING
PLEASE
WAIT
LO CONTL OK
PT 12.8
12/18/13 4:01 PM
REMOVE STRIP
CoaguSense, Inc.
Need help?
Do you have a question about the Coag-Sense Prothrombin Time PT/INR and is the answer not in the manual?