Chapter 5 Electrical Connection; Safety Instruction For Hot-Line Job - SAJ Sununo Plus Series User Manual

Solar inverter
Table of Contents

Advertisement

Chapter 5 Electrical Connection

5.1 Safety Instruction for Hot-line Job

Electrical connection must only be operated on by professional technicians. Please
keep in mind that the inverter is a bi-power supply equipment. Before connection,
necessary protective equipment must be employed by technicians including
insulating gloves, insulating shoes and safety helmet.
· Dangerous to life due to potential fire or electricity shock.
· When power-on, the equipment should be in conformity with national rules and
regulations.
· The direct connection between the converter and high voltage power systems must be
operated by qualified technicians in accordance with local and national power grid
standards and regulations.
hen the photovoltaic array is exposed to light, it supplies a d.c voltage to the inverter.
· W
· Electrical connection should be in conformity with proper stipulations, such as
stipulations for cross-sectional area of conductors, fuse and ground protection.
·The overvoltage category on DC input port is II, and that on AC output port is III.
DANGER
WARNING
NOTICE
- 24 -
Sununo Plus Series

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sununo Plus Series and is the answer not in the manual?

Questions and answers

durendez
February 6, 2025

hello what is the message error code 6 GFCI dev err M

1 comments:
Mr. Anderson
February 10, 2025

Error code 6 for the SAJ Sununo Plus Series indicates "GFCIDevErrM," which means "GFCI Devices Error Master." If this error occurs frequently, users are advised to contact their distributor or SAJ for support.

This answer is automatically generated

Table of Contents

Save PDF