Scope Of Delivery, Assembly; Scope Of Delivery; Assembly; Storage - Advanced Energy Thyro-Power Manager Operating Instructions Manual

Table of Contents

Advertisement

Attention Mains Voltage!
Safety rules for work performed to electrical facilities:
1. Disconnect equipment from the mains (establish a voltage free status)
2. Secure equipment against re-activation
3. Determine voltage free status of equipment by measurement
4. Ground and short-circuit equipment
5. Cover or establish borders to neighboring parts under voltage

4.2. SCOPE OF DELIVERY, ASSEMBLY

4.2.1. SCOPE OF DELIVERY

The delivery is comprised of the following parts:
Thyro-Power Manager
Pouch with screws/ plug terminals
Operating instructions

4.2.2. ASSEMBLY

The units must be assembled on the overhead rail within a switch cabinet / casing.
Voltage supply is performed at terminal X1. In the course, the connection voltage must
be selected there, and the according jumpers must be set (230V~ jumper X1.5 – X1.6;
110V~ jumper X1.4 –X1.6 and jumper X1.5 – X1.7).
Grounding shall be performed at X1.1 or X1.2 in accordance with local regulations! For
this, see also chapter 4.5.4.1 connection for voltage supply.

4.3. STORAGE

The Unit may be stored in rooms, which are dry, ventilated, and equipped with a fixed
protection roof, and originally packaged.
Permissible ambient temperature: -25°C to +55°C
Permissible relative air humidity: max. 85%
For longer storage durations, the Units should be contained in airtight plastic skins with the
use of commercially available drying agents.

4.4. REQUIREMENTS FOR INSTALLATION

4.4.1. DIMENSIONS / WEIGHTS

The Unit possesses the following dimensions and weight:
13
14
Unit
Thyro-Power
Manager
Consider the following necessary free space upon assembly:
20 mm upwards
20 mm downwards

4.4.2. GENERAL REQUIREMENTS

The units may be assembled next to each other without a sideward gap.
The user must install the Unit within a casing or switch cabinet so that no dangers exist due
to touching and that those applicable standards and safety regulations are complied with!

4.5. INSTALLATION

4.5.1. COOLING

It shall be observed that the maximum ambient temperature of 55°C is not exceeded.

4.5.2. GROUNDING

Grounding shall be performed in accordance with the local regulations (terminal X1.1 / X
1.2)! Grounding is also achieved via EMC facilities (Y – capacitor 4.7nF).

4.5.3. ELECTRO TERMINALS

The unit shall only be connected to the voltage supply, and to further external components
(power controllers, measuring transformers), which are contingent to the application. For
this, the following connections are necessary:
Voltage supply: 110V~ / 230V~ at terminal X1
Mains load optimization: power controller at terminals X3, X4
Network peak load monitoring / measurements:
o up to 3 converters (1V~) at terminal X5
o up to 6 DC outputs (10V-) at terminals X7, X8
o Error / alarm message at terminal X8
I/O mdoule:
o up to 10 digital outputs at terminals X3, X4
o up to 6 analog outputs (10V-) at terminals X7, X8
o up to 3 analog DC-inputs at terminals X5, X6
o up to 3 analog AC-inputs at terminal X5
PC-connection: at terminal X9 (RS232)
Bus module interface connection: at terminal X2
Width
Height
Depth
150mm
95mm
60mm
Weight
0.35kg

Advertisement

Table of Contents
loading

Table of Contents