Setting The Number Of Devices Deployed; Setting The Limiting Value For Monitoring; Setting The Elementary Period Duration T; Operation - Advanced Energy Thyro-Power Manager Operating Instructions Manual

Table of Contents

Advertisement

8.1.2. SETTING THE NUMBER OF DEVICES DEPLOYED

If network load optimization is used, the number of power controllers or
power controller groups must be set using the switch S2 (see chapter 8.2).
In PC mode, the setting can also be performed by help of the PC program.

8.1.3. SETTING THE LIMITING VALUE FOR MONITORING

If network peak load monitoring is used, limiting value must be set via the
help of the potentiometer R310 (see chapter 8.5). In PC mode, the setting
can also be performed by help of the PC program.

8.1.4. SETTING THE ELEMENTARY PERIOD DURATION T

The elementary period duration T0 can be set by help of the potentiometer
R309 (see chapter 8.4). In PC mode, the setting can also be performed by
help of the PC program.
Caution!
The elementary period duration T0 is default set to 50 periods
= 1s ex works. Usually, this setting does not have to be
changed. Thus, the potentiometer can remain unchanged in
most cases!

9. OPERATION

Mains voltage - danger!
Activate the Unit only if it is secured that all necessary
measures for protection against electric shock are
implemented.

9.1. REGULAR OPERATION

Enabling mains voltage during regular operation activates the Unit.
Subsequently, the green power LED H100 and the green ON LED H101
should burn. If network load optimization is used, the LEDs H201 - H210
turn ON one after another (contingent to the selected number of devices
deployed). All measurements and functions are performed as selected.
45
46

9.2. SERVICE OPERATION

9.3. END OF OPERATION
10. MAINTANANCE
0
10.1. REPAIRS
11. TECHNICAL DATA
Type
Technical data
Voltage supply X1:
Mains voltage:
Power consumption:
If the switch S1.6 is closed, the Thyro-Power Manager operates within an internal testing
mode. This is only used at the manufacturer's works. If the testing mode is active, the
regular functions are not executed anymore!
The end of operations is achieved by de-activation of the mains voltage. Within standard
default settings, the operating time counter is then stopped, and the according value is
stored (auto save = ON). This possibly also happens for an energy measurement.
In general, no maintenance measures are necessary for the Thyro-Power
Manager. Yet, one shall observe that the level of contamination is held in
limits and that the permissible ambient temperatures are not exceeded.
AEG PS shall annul all possible obligations, such as guarantee
commitments, service agreements etc., which may be agreed upon by
AEG PS and its distributors, without prior notice if no maintenance is
performed to the Unit, and if purchased spare parts other than OEM AEG
PS or such other purchased by AEG PS are used for maintenance and
repair.
Expert personnel of the company AEG may only perform repairs made to
the unit. Only OEM spare parts are allowed to be used. Repairs performed
by personnel of the user require approval of the manufacturer.
Thyro-Power Manager
230V~ -15% +10%
110V~ -15% +10%
1.5W

Advertisement

Table of Contents
loading

Table of Contents