Advanced Energy Thyro-Power Manager Operating Instructions Manual page 15

Table of Contents

Advertisement

constant. In order to be able to perform optimization, the start-up times Ts of each single
power controller and their load I0 should be known (Thyro-Tool Family). The following
figures display an example deploying 6 power controllers:
Figure 19: Power controller without mains load optimization with different Ts
The following Ts selections are provided here:
Ts1 = 40, Ts2 = 10, Ts3 = 26, Ts4 = 13, Ts5 = 12, Ts6 = 10, accordingly as network periods
As the amount of electrical current I0 is equally high, one can optimize the start-up times as
follows:
T1 = 0 (from 0 – 39 ON), T2 = 40 (from 40 – 49 ON), thus 1 x 50 periods are fully
accommodated,
29
30
T3 = 0 (from 0 – 24 ON), T4 = 25 (from 25 – 37 ON), T5 = 38 (from 38 – 49 ON, thus 2 * 50
periods are fully accommodated,
T6 = 0 (from 0 – 9 ON), the time point is not capable for optimization.
Thus, the electrical current distribution changes as follows:
Figure 20: Power controller with manual mains load optimization employing different Ts

Advertisement

Table of Contents
loading

Table of Contents