4. Remove the ground wire screw to release the
power cord from the top cover.
NOTE: Whenever any chassis ground screw is
removed and then reinstalled, the ground path must
always be checked from that screw back to the
ground at the end of the power cord.
5. Once the ground screw is removed, pull the
ground wire up through the top cover.
6. Raise the top cover up to disengage the main
harness from the harness clip on the underside
of the top cover.
7. The main harness and the pressure tube need to
be pushed down through the top cover.
8.
Lid Switch
The lid switch is located on the machine control. If
the switch malfunctions, the machine control will
need to be replaced.
The magnet is located in the front of the lid. When
switch contacts.
– 29 –