Installation, connecting up, commissioning
4.2 Installing, connecting up and commissioning
4.2
Installing, connecting up and commissioning
Prior to installation and commissioning
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller", refer to the documentation in the
Appendix.
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
Pulling/plugging the module
NOTICE
Turning off the station when plugging/pulling the module
Before pulling or plugging the module, always turn off the power supply to the station.
24
CAUTION
Operating Instructions, 02/2015, C79000-G8976-C384-01
CP 1243-1 PCC