Level Assembly In Two Sections; Model Lt106 (Stainless Steel) - Tecfluid Series LT Instruction Manual

Level gauge
Table of Contents

Advertisement

7

LEVEL ASSEMBLY IN TWO SECTIONS

When the level gauge is delivered in two sections, due to its total length, the following
instructions must be followed carefully for its correct installation.
The numbering of the different elements corresponds to the different figures.
NOTE: Handle the glass tube sections with care.
7.1

Model LT106 (stainless steel)

Fix the lower half of the level to the installation.
Remove the adhesive tape from the lower glass tube (5) and loosen the 3 screws DIN933
M5 x 30 (4) without removing the nuts (2).
In case there is not enough space to introduce the float (6) through the lower part of the
gauge body once the assembly is completed, the float must be in its correct position inside
this lower half at the time of installation.
NOTE: The clamp (1) that fixes the guide-support (3) should never be loosened.
DETAIL A
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents