Commissioning In Valve Coupler Mode - Pepperl+Fuchs FieldConnex F2D0-MIO-Ex12.FF Series Manual

Multi-input/output device
Table of Contents

Advertisement

Multi-Input/Output Device
Installation and Commissioning
3.4

Commissioning in Valve Coupler Mode

Danger!
Danger to life from unannounced operation of plant parts
During the initialization run, the valve is opened and closed once. Performing an initialization
run without explicit permission or having the plant in maintenance mode can pose personnel in
the plant at risk of coming into contact with hazardous substances or being exposed to
unexpected mechanical hazards.
Before starting the initialization run, ensure that you have permission/the plant is in
maintenance mode, so you do not endanger persons.
Caution!
Property damage from unannounced operation of plant parts
During the initialization run, the valve is opened and closed once. Performing an initialization
run without explicit permission or having the plant in maintenance mode can pose the plant at
risk of being damaged.
Before starting the initialization run, ensure that you have permission/the plant is in
maintenance mode.
When commissioning the MIO device in the valve coupler mode, a transducer block is
parameterized in 2 steps.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fieldconnex r8d0-mio-ex12.ff series

Table of Contents